Skip to main content

Annual data returns at Mossmorran

Both ExxonMobil and Shell are required to submit a range of data returns throughout the year for SEPA to review.

The following have recently been reviewed.

ExxonMobil Fife Ethylene Plant

  • Condition 5.2.5 – Boiler Stack Monitoring Results (every 6 months)

In addition, SEPA commissions monitoring of the boiler & furnace stacks.

Recent monitoring reports:

Shell Fife Natural Gas Liquids Plant

    • Condition 2.8.2: Start up plan
    • Condition 2.9.4: Decommissioning plan