Annual data returns at Mossmorran
Both ExxonMobil and Shell are required to submit a range of data returns throughout the year for SEPA to review.
The following have recently been reviewed.
ExxonMobil Fife Ethylene Plant
- Condition 3.2.2 – Odour Assessment (4 yearly)
- Conditions 3.5.1 & 3.5.3 – Annual report on fugitive emissions 2021
- Condition 4.1.4 – Annual Air Emissions Report 2021
- Condition 4.1.5 – Annual Mass and Composition to Air Report 2021
- Condition 4.2.5 – Annual Water Emission Report 2021
- Condition 4.2.6 – Sampling Plan for 2022
- Condition 4.2.8 – Annual Overflow Emissions Report 2021
- Condition 4.3.1 – Annual Flaring Events Report 2021
- Condition 4.3.12 – Flare Prevention and Minimisation Update 2021
- Condition 5.2.5 – Annual Large Combustion Plant and Mass Emissions Report 2021
- Condition 5.2.5 – Boiler Stack Monitoring Results (every 6 months)
In addition, SEPA commissions monitoring of the boiler & furnace stacks.
Recent monitoring reports:
Shell Fife Natural Gas Liquids Plant
- Condition 2.4.7: Incident Prevention and Mitigation Plan this document also includes:
-
- Condition 2.8.2: Start up plan
- Condition 2.9.4: Decommissioning plan
- Condition 2.5.2: Resource Utilisation
- Condition 2.6.1: Waste Minimisation
- Condition 2.7.5: Groundwater
- Condition 3.1.1: Noise Report 2020
- Conditions 3.4.1 & 3.4.3: Annual report on fugitive emissions
- Condition 4.1.4: Air emission report
- Condition 4.1.5: Mass and combined emission to air report
- Condition 4.2.5: Water emission report
- Condition 4.2.6: Sampling Plan. (being checked)
- Condition 4.2.9: Water disposal sampling and disposal
- Condition 4.3.1: Flaring events.
- Condition 4.3.12: Review of ground flaring from the installation (Q1 2022 and Q2 2022)